Inspection rules are everywhere. They all ask for proof.

Every utility answers to inspection rules, from national codes to state orders to wildfire plans. They differ in the details, but they ask for the same three things.

  1. 1

    Inspect on a cycle

    Patrols and detailed inspections on a set schedule, with every asset accounted for.

  2. 2

    Correct within a window

    Each condition gets a deadline based on how serious it is and where it sits.

  3. 3

    Keep the record

    Proof of what was found, who confirmed it and when it was fixed, ready for review.

Federal, national and state rules

Wherever you operate, ThreeV works to the rules you answer to.

Federal and national
  • NESC

    The baseline construction and maintenance code most state commissions adopt.

  • NERC FAC-003 and FAC-008

    Transmission vegetation management and facility ratings that match what's in the field.

  • RUS Bulletin 1730B-121

    Wood pole inspection cycles for cooperatives and RUS borrowers.

  • OSHA 1910.269

    Worker safety around energized lines.

State
  • Inspection and correction rules

    Every state commission sets its own inspection cycles, correction windows and records, for example GO 95 and GO 165 in California, HB 144 in Texas or OAR 860-024 in Oregon.

  • Wildfire mitigation plans

    Expected in a growing number of states, each with its own inspection commitments.

  • Resiliency plans and rate cases

    Increasingly asking utilities to link spending to measurable risk reduction.

  • Wherever you operate

    Colorado, Arizona or anywhere else, we map your question set and priorities to the rules you answer to.

A summary for orientation, not legal advice. Requirements vary by state and change over time.

Priorities that match your correction windows.

We set ThreeV's priority levels to match the rules you answer to, so every finding arrives with a deadline your compliance team already recognizes.

Keep the record

What was found, who confirmed it, its priority and when it was fixed, all linked back to the images. Ready when the regulator asks.

Where ThreeV fits.

Vision produces confirmed findings with the evidence attached and a priority on each one. Validate ranks them, tracks each one to repair and rolls everything up for the filing, whichever rules you answer to.

Ranked work plan
Illustrative ranked work plan: five findings ordered by risk with the reason for each rank
#AssetFindingRiskWhy it ranks here
1Pole 41-2207Crossarm splitHighHigh consequence circuit, fire risk area
2Pole 18-0431Insulator crackedHighFeeds a hospital, no recent inspection
3Pole 41-2190Leaning poleMediumTwo prior findings, worsening
4Pole 07-3312Woodpecker damageMediumModerate consequence, stable
5Pole 22-1045Missing guy guardLowLow consequence, quick fix
Illustrative. Every rank links back to the finding, the reviewer and the image.